50 stations or 500, delivered. Period.
From specifications to acceptance: schedule management, contractor coordination and budget tracking. NF C 15-100 compliance guaranteed.
Methodology. Nothing left to chance.
Rigorous project tracking to secure every stage of your charging infrastructure.
Pre-Project
Preliminary studies, feasibility analysis and sizing tailored to your usage patterns and constraints.
Coordination
Stakeholder management, operations planning and coordination across all trades.
Budget Tracking
Cost management, expenditure control and clear real-time reporting.
Compliance
Strict compliance with IRVE standards (NF C 15-100, UTE C 15-722) and applicable regulatory requirements.
Planning
Definition of key milestones, deadline adherence and proactive risk anticipation.
Commissioning
Testing, final acceptance and transition to operational deployment.
From specifications to commissioning.
A four-step approach to bring your IRVE projects to completion.
Understanding usage patterns, site analysis, feasibility studies and precise scope definition.
Schedule development, critical milestones, resource allocation and project organization.
Operational coordination, risk management, regular reporting and continuous adjustments.
Final quality control, compliance validation, complete documentation and knowledge transfer.
The proof, in numbers.
Projects delivered
On-time delivery
NF C 15-100 compliance
Budget under control
Frequently asked questions
What is IRVE project consulting (AMO)?
IRVE project consulting (AMO - Owner's Project Assistance) involves supporting the project owner through all phases of their charging station deployment: feasibility study, specification drafting, contractor selection, works supervision and installation acceptance.
How much does an IRVE deployment project cost?
The cost varies based on the number of charging points, power output (AC or DC), civil engineering works and grid connection. We provide a detailed budget study from the scoping phase, identifying public subsidies (ADVENIR, CEE) to optimize your investment.
What is the typical duration of an IRVE project?
A complete project (study + installation + commissioning) typically takes 3 to 6 months. Simple projects (a few AC stations) can be completed in 4 to 8 weeks. Large-scale multi-site deployments require 6 to 12 months of management.
Do you work with CPOs and EMSPs?
Yes, we collaborate with Charge Point Operators (CPO) and e-Mobility Service Providers (EMSP) for the deployment, maintenance and supervision of their networks. Our approach covers mainland France and Belgium (Wallonia, Flanders, Brussels). We act as the on-the-ground arm of CPOs for the installation, commissioning and maintenance of their multi-brand fleets, with consolidated reporting and contractual SLAs tailored to each operator.
Your deployment starts here.
A dedicated project manager, a clear method and a commitment to results across France and Belgium. Let's talk about your IRVE objectives.
Worth reading too
Multi-site IRVE deployment: lessons from the field
Methodology and insights drawn from over 2,000 interventions on multi-site IRVE projects across France and Belgium.
Read the articleCharging station installation pricing in 2026
Detailed pricing by power output and use case, with the available subsidies to optimize your installation budget.
Read the articleCharging Plan 2030: France targets 400,000 public charging points
A breakdown of the government plan targeting 400,000 public charging points by 2030 and its implications for IRVE players.
Read the article